Duration
24 weeks
Value
£118,000
Scope of works
The scheme consisted of a single storey extension to provide general WC and Disabled WC facilities.
The works incorporated:
- Associated mechanical and electrical services
- Minor external work and associated alterations to the external building.
- Initial works consisted of the excavation of site strip and foundations, including drainage alterations and removal of redundant sections and the formation of a single storey extension, cavity walls consisting of block and brick construction, brickwork to match existing
- UPVC windows and curtain wall section with aluminium doors
- Timber and felt roof at 10% pitch
- Insertion of new cavity trays to existing structure
- Strip out existing WC and refurbish
- Disabled WC facilities.
- Extend and upgrade electrical, IT and telephone system
- Extend and upgrade existing heating system
The existing premises were occupied throughout the whole of the contract.
Roles & Responsibilities
Principal Contractor
Contract type
JCT Standard Building Contract with Quantities 2005 Edition